Divisional requirements in Central Railway. Creation and extension of the duration of the following temporary posts. 1. Creation of 3Sr.Scale posts of Executive Engineers for two years w.e.f. the date those posts are filled S.No2. (2) Creation of 8 JS/Class II posts of Asstt. Engineers for two years w.e.f. the dates those posts are filled (S.No2) (3) Extension of the temporary JS/Class II posts of Assistant Engineer (Const.) Jabalpur for one w.e.f. 13-9-59(S.No7) (4) AEN (Const) Nagpur extended upto 28.10.61 (S.No.10 and 28) (5) AEN (Const) Kazioet-AEN(Const) SC East Upto 15.11.61(S.No.13and 24) (6) Executive Engineer (Const) Bhusawal extension for 2 years w.e.f. 1-1-60(S.No.18) made permanent w.e.f. 1-1-62 and re-designated as Divisional Engineer (Bhusawal (S.No.34) (7) Executive Engineer (Const) SC extended upto 25-4-62 (S.No.21and31)

Keywords Bombay
M.N.Chakravarti
Department Ministry of Railway
Branch Establishment Gazetted Services
From Year / Date
(YYYY-MM-DD)
1956
To Year / Date
(YYYY-MM-DD)
1956
Identifier PR_211200044135
File No. E56P05-1/1-35
Location Repository-4
File Size 103.7 MB
Pages 117
Collection Digitized Public Records
Ministry of Railway
Language English
    1 view

Other Similar Items