Central Railway. Khandwa- Hingoli Railway construction. sanction for gazetted posts for, decision :- (1) Elev. Eng. S.S. B.B/ Khandwa/ Akola/ Basin Extended up to 31-3-58-( S.NO.2) (2) Assistant Executive Engineer JS/CL.II (a) Tukaithar (N) - ex. up to 31-3-58( S.NO.2) (b) Khandwa -ex. unto 31-3-57( S.NO.2) further extended up to 30-9-58 ( S.NO.11) Again extended up to 30-9-59 (S.NO.21) ( c) Akola -ex. up to 31-3-58( S.NO.2) (d) Akot (N) -ex. up to 31-3-58( S.NO.2) (e) Akot (S) Akola -ex. up to 31-3-58( S.NO.2) (f) Basim ex. up to 31-3-58( S.NO.2) (i)Hingoli ex. up to 12-31-57( S.NO.2) (3) Assistant Bride Engineer manmad ex.31-3-58 (S.NO.2) ( 4) sanction Accorde to the operation of the temporary JS/class II post of 2nd Assistant Engineer, Basim at Barsi Takli w.e.f. 10-6-57 to 8-4-58 (S.No.18) - extended up to 30-6-59- (S.NO.18)

Keywords Bombay: V.P.Sawhney
Department Ministry of Railway
Branch Establishment Gazetted Services
From Year / Date
(YYYY-MM-DD)
1957
To Year / Date
(YYYY-MM-DD)
1957
Identifier PR_211200044153
File No. E/GS/57P05-23/1-22
Location Repository-4
File Size 37.5 MB
Pages 48
Collection Digitized Public Records
Ministry of Railway
Language English
    1 view

Other Similar Items